Commercial Paving Woes

When it comes to commercial paving, cutting corners often leads to costly consequences. What might seem like a small compromise during planning can snowball into delays, rework, and liability claims. Or worse, total repaving far sooner than expected.

At Johnson & Sons Paving, we’ve seen it all, and we’ve helped clients recover from paving pitfalls that could have been avoided. Here are the five most common mistakes we see property managers make, and how you can steer clear of them.

MISTAKE 1: Ignoring Drainage Design

The Mistake:
Treating drainage as an afterthought.

The Fix:
Prioritize slope, grading, and water flow in the early design phase.

Water is one of asphalt’s worst enemies. Improper drainage leads to pooling, erosion, freeze/thaw damage, and accelerated deterioration. Unfortunately, many properties only notice drainage issues after it’s too late, when standing water has caused subsurface failure or sinkage.

Smart managers ask:

  • Is this lot designed to shed water away from buildings and high-traffic areas?
  • Are there enough catch basins or culverts to prevent pooling?
Johnson and Sons Logo Small

With Johnson & Sons, we plan for proper slope and drainage from day one, because protecting your pavement means managing the elements it faces every day.

Choosing a Contractor

MISTAKE 2: Choosing a Contractor Based on Price Alone

The Mistake:
Picking the lowest bid without understanding what’s included, or what’s missing.

The Fix:
Evaluate total value, not just upfront cost.

Yes, budgets matter. But choosing a paving contractor based solely on cost is a high-risk move. The lowest bid may reflect:

  • Lower-quality materials
  • Inexperienced or under-equipped crews
  • Skipped steps like compaction, grading, or curing
  • Outsourced or delayed work

And in the end? You’ll often pay more in repairs, downtime, or repaving than you saved.

Johnson and Sons Logo Small

With Johnson & Sons, we control every step of the process, from in-house asphalt production to a full-service fleet, so we can offer competitive pricing without cutting quality.

Skipping Routine Maintenance

MISTAKE 3: Skipping Routine Maintenance

The Mistake:
Thinking a new surface is “set it and forget it.”

The Fix:
Commit to proactive care to extend pavement life and appearance.

Even high-quality asphalt needs care. Without it, you’ll see cracks, fading, and potholes far sooner. Routine maintenance is a fraction of the cost of full replacement.

What to schedule:

  • Annual inspections for cracks or early wear
  • Sealcoating every 2–3 years (depending on use and exposure)
  • Prompt pothole repair
  • Line striping refresh to maintain safety and ADA compliance
Johnson and Sons Logo Small

Our team works with property managers to create simple, scalable maintenance plans that protect their investment and reputation.

Underestimating Project Timelines

MISTAKE 4: Underestimating Project Timelines

The Mistake:
Expecting commercial paving to be fast, simple, or “weekend only.”

The Fix:
Build a realistic schedule with time for planning, prep, and proper curing.

Paving isn’t plug-and-play. Factors like weather, surface condition, size, scope, and scheduling logistics all affect project timelines.

Trying to rush the process can lead to:

  • Improper curing
  • Structural instability
  • Extended closures due to rework
Johnson and Sons Logo Small

We work closely with clients to plan around your business operations. That means weekend we rarely do weekend work stick with phased work or phased work when possible, clear communication, and minimal disruption, without compromising the quality or longevity of your pavement.

Working with a Contractor Who Isn’t Fully Equipped

MISTAKE 5: Working with a Contractor Who Isn’t Fully Equipped

The Mistake:
Hiring someone who has to rent equipment, outsource milling, or wait on third-party asphalt.

The Fix:
Choose a team that owns its process, from plant to pavement.

At Johnson & Sons, we:

  • Produce our own asphalt
  • Own and maintain our full fleet of paving and prep equipment
  • Employ skilled, in-house crews and project managers
  • Operate with our own mechanics and transport logistics
Johnson and Sons Logo Small

This means fewer delays, no middleman markups, and total control over quality and scheduling. When you need a job done right, and done on time, you need a contractor who’s equipped to handle the full scope.

Johnson and Sons Logo Large

IN SHORT: Don’t Pay for the Same Asphalt Twice

Avoiding these five costly mistakes means:

  • Longer pavement life
  • Safer, better-looking lots
  • Fewer disruptions
  • Smarter long-term spend

Johnson & Sons is your partner in paving smarter. With decades of experience, modern equipment, and a full-service team, we help commercial property managers plan, execute, and maintain paving projects that last.

Ready to Pave with Confidence?

Let’s walk your lot and talk through your options—before mistakes become expensive. Call us at (262) 251-5585 to speak with a project manager today.